Most of what has to happen before a stump is ground happens on the phone and online, and you won't be the one doing it. The operator files a utility locate request. Your job is smaller: tell us what's buried that the utilities don't know about, and clear a path. This guide covers both, with the Utah rules behind them.
Who calls Blue Stakes
The operator does. In Utah, the free utility locating service is Blue Stakes of Utah, and the rule is plain about who files. Blue Stakes says the party who will actually be doing the excavation must make the request. A general contractor or a homeowner can't call it in for them.
The law defines excavation broadly. Utah Code 54-8a-2 covers any operation that moves or displaces earth, rock or other material on or below the ground. Grinding a stump moves ground with a machine, so we treat every job as one that needs a ticket. That's our policy, not a legal opinion. The same FAQ says to call no matter how shallow the digging is, because many cables and pipes lie close to the surface.
The timing
Blue Stakes requires notice at least three business days, and no more than 14 calendar days, before digging starts. The statute, Utah Code 54-8a-4, sets the minimum at 48 hours, which Blue Stakes counts only on business days. A request expires 21 calendar days after it's submitted. If the grind slips past that, the operator has to update the request.
That's why we can't promise a grind date the minute you book. An operator claims the job and files the ticket, and the earliest grind is three business days after that.
What it costs you
Nothing. Member utilities mark their lines at no cost, and the national 811 service is also free. The one catch: Blue Stakes says operators may bill for their costs when an area is requested again and again without any digging. That's one more reason we want the grind to happen on the date we set.
What the colored marks mean
A few days after the ticket goes in, you may see paint or flags in your yard. Utility companies mark with the American Public Works Association colors. According to Blue Stakes:
- Red: electric power lines, cables, conduit and lighting cables
- Yellow: gas, oil, steam, petroleum or gaseous materials
- Orange: communication, alarm or signal lines, cables or conduit
- Blue: drinking water
- Purple: reclaimed water, irrigation and slurry lines
- Green: sewers and drain lines
- White: proposed excavation
- Pink: temporary survey markings
Leave the marks where they are until the stump is done. The FAQ puts it on the excavator to respect and protect them, but a mower or a garden hose can wipe out paint too. If marks fade or get destroyed before the grind, the excavator can ask Blue Stakes to mark the area again. Tell us and we'll pass it along.
One more rule worth knowing. Blue Stakes describes a tolerance zone of 24 inches on either side of a mark, and inside it the digging should be done with extreme care, using hand tools or other methods that won't damage the line. If a mark runs through or beside your stump, expect the operator to message you before grinding.
The lines nobody marks for you
This is the part that's on you. Utah requires utilities to mark only the lines they own and maintain. Under Utah Code 54-8a-2, a property owner isn't an "operator" for lines that serve only that property and that the owner maintains. Those lines may not be marked at all. Blue Stakes names a few: water and sewer laterals, sprinkler and irrigation systems, and lines to a septic system.
In a typical yard, that can also mean:
- Sprinkler lines and valve boxes, especially near an old tree where a head was moved around the roots
- Power to a detached garage, a shed or a lamppost
- Propane lines to a grill, a fire pit or a tank
- Septic lines and tanks, if your home isn't on sewer
Grinding goes several inches below grade, and these lines are often shallower than people expect. That's why the booking form asks you to flag private lines, and why we'd rather you over report than guess. If you don't know what's out there, say so, and we'll pass that to the operator.
Flag what you know
Before grind day, mark sprinkler heads near the stump with a flag or a stake, and mark any line you can trace by hand from the house, a valve box or the meter. A photo of the area from two sides, with the flags in it, helps more than a long description.
When to hire a locator
If you can't say what's under the stump and it sits near a garage, a shed, a septic area or a sprinkler zone, consider a private utility locator. Blue Stakes says the excavator should consider hiring one for private lines that could conflict with the work, and it doesn't endorse any particular company. Private locating isn't part of our price, so a locator's fee would be your call.
Clearing the area
None of this is regulated. It's just what makes the visit go quickly.
- Move cars, planters, hoses, toys and furniture out of the work area and the path to it.
- Check that the gate opens. A grinder needs a clear way in, and the operator needs to know if your gate is narrow.
- Tell us about gate codes and dogs, so nobody meets a loose pet in the yard.
- Mention anything you know about the stump itself: rocks, old fence posts, edging or wire near the base. Metal in the wood can damage the cutting teeth.
You don't need to be home on grind day if access is clear and private lines are flagged. The operator texts when they arrive, takes before photos, grinds, rakes the chips back and takes after photos. You pay once those are in.
If something's hit anyway
Marks and flags lower the odds. They don't remove them, and nobody can promise a dig is risk free. Our terms will say who pays when an unflagged private line is hit. They're still in draft, so we'd rather tell you that than promise something we haven't written down. Every operator will be required to carry their own insurance.
What to do now
Walk the yard once. Find the sprinkler heads and valve box, trace any line to a shed or lamppost, and note anything buried near the stump. Then price your stump. It takes a few minutes, and the form asks for exactly this.
Sources
- Blue Stakes of Utah, frequently asked questions: definition of excavation, notice window, ticket life, colors, private lines, tolerance zone, cost
- Utah Code 54-8a-2: definitions of excavation, tolerance zone and operator
- Utah Code 54-8a-4: notice before excavation, and how long it lasts
- Blue Stakes of Utah, Utah state law: the 48 hour period and 21 day request life
- 811, national before you dig service: the national 811 service is free
We plan to open in spring 2027. Terms and operator insurance details are still being drafted.
Price your stump
Measure it, add any options, and see the price now. Reserving is free and takes no card.